Thu 13 Mar 2008
Server Room Overhaul Phase 2
Posted by Andrew Mitry under Web/Tech
Comments Off
The second phase of the server room overhaul is coming along nicely, we got all the switches, patch panels and Neat-Patch installed on the telecom rack. We are almost done running 24 cables to move a switch/patch panel from our senior priest’s office to the server room (that required drilling holes through two concrete block walls). Next step is to reassign some of the ports to different vlans and cleaning up the wiring.
Once again, mega props to volunteers Miranda, Samer and Tina for all their hard work.